
You know how the shift is going
without waiting for the report.
We put agents on your floor: they write each shift report, follow the orders, and warn you when something slips.
Today versus with the agent
The same shift, told twice
How it happens todayWith the agent inside
16:04An order falls behind. It is noticed when it can no longer close.The deviation is flagged while it can still be corrected.
19:30A line runs out of material. It is requested by radio and written down later.The shortage is logged, with line, quantity, and who owns it.
22:00The shift closes. The report is built tomorrow, from memory.The shift closes. The report is already built.
Next dayProduction and warehouse bring different numbers to the meeting.Both read the same report, with the source of every figure.
What you already work with
Inventory, purchasing, and costs
Inventory and invoicing in SAE
Google FormsFloor captures, by shift
Google SheetsThe shift plan
You do not switch systems. The agent works inside the ones you use.
SAPProduction orders
OdooMRP and warehouse
SiemensLine PLC and SCADA
Rockwell AutomationLine controllers
These are examples. If your operation lives in another system, the agent connects to that one.
How the agent works
Production orders
Inventory
Line stops
Shift plan
Floor capturesFloor log
You ask it the way you would ask someone on your team.
It reads what your systems already record, cross-checks it, finds the cause, and hands you the document. Anything that goes outside waits for your signature.
Your knowledgeManufacturing agent
Build the report for the shift that just closed and flag the orders that did not reach schedule.
Manufacturing agentTwo of three orders on schedule. WO-4415 ended 24% short: line 3 went 90 minutes without material, and the shortage is already logged with the warehouse.
Shift 2 · orders against scheduleToday, 22:00
Two of three orders on schedule. WO-4415 closed 24% short after 90 minutes without material on line 3.
Pieces per orderScheduledProducedBehind schedule
Shift deviation against schedule, %Deviation
Causeline 3 went 90 minutes without material. The shortage was logged under the warehouse.
Read from
SAP ·
Siemens ·
Google Forms
Open in Google Sheets
Shift report ready, with WO-4415 flagged
The numbers come from the systems, not from what someone managed to write down.
- DetectedShift 2, 17:30WO-4415 slips behind its schedule
- Notified17:32To the floor supervisor, without anyone asking
- LoggedAt close, 22:00With the time and which system the data came from
Next step
Every shift leaves what you need to cut waste. An agent turns it into decisions before the next one.
Review my plant